00974 44 66 60 91/2/3
Week days: 08:00 - 17:30 Thursday: 08:00 - 13:30 Friday: Closed

Field of Activities

MEGATEC accomplished a wide range of construction projects, namely hotel & resorts ,universities, residential & commercial buildings, sports facilities and many more.

 

Our core operations are segmented into 2 parts:

  • Mechanical 
  • Electrical

 

A. Mechanical Systems:

This segment is further divided in to 5 Sub-Systems, i.e

1. Air Conditioning System:

  • Chillers, Packages, VRV system Etc
  • Air handling units and fan coil units
  • Chilled water network
  • Duct works (G.I. and Pre insulated)
  • Insulation
  • Cold storages
  • Controls

2. Plumbing and Drainage System:

  • Cold water piping network
  • Hot water piping network
  • Soil and Waste piping network
  • Storm drainage piping network
  • Various equipment
  • Sanitary fixture and fittings

3. Fire fighting systems:

  • Sprinkler systems
  • FM-200 system
  • Carbon dioxide system
  • Pre-activated and deluge system

4. Irrigation System

  • Automation and Semi-automation system
  • Various equipment

5. Water treatment system, Swimming pool , Jacuzzi & Spa, and Garbage chutes

 

B. Electrical Systems:

This segment is further divided in to 2 Sub-Systems, i.e.

1. Power System 

  • H.V. Switchgears
  • Transformers
  • MV and LV Panels
  • Motor Control Centers.
  • Lighting Fixtures
  • Central Battery Systems
  • Cable Trays, Ladders, Overhead and under floor Trunking.
  • Bus ways
  • BMS System

 

2. Low Current System

  • Fire Alarm Systems
  • CCTV System
  • Public Address System
  • Audio Visual System
  • Telephone and Data System (Structured Cabling)
  • MATV System
  • Interphone System
  • Security and Access Control System
  • Car Barrier System